The Buccoo Buoy was inspected on 11 May 2015. While the anchor ropes and
metal base required cleaning, the sonde, probes and protective case
were relatively unfouled. Badic maintenace was conducted on the sonde. None of the probes required the copper antifouling tape to be replaced. The sacrificial anode was replaced.
A calibration was not conducted on this trip, and the sonde was cleaned and re-installed.
Data from the Sontek ADP was collected. The unit seems to be working fine and the data looks good.
The status of RMY RH sensor remains the same.